Parex Speedsure S Grout 25kg
Product code: 650337
- Easy to use - just add water and mix.
- Quick setting.
- High early compressive strength.
Uses include:
- In situations that require a quick gain in early compressive strength.
- Repairs to car parks, forecourts, loading bays and ramps that require early trafficking.
- Factory floor repairs, ruts, hollows and cracks.
- Grouting in marine/ tidal zones. Fast-track installation of pre-cast units.
- Fast-track installation of base plates.
Standards:
Speedsure S Grout has been tested in accordance with the appropriate parts of the following standards: EN12390 EN197 ASTM C827 ASTM C230 Specification Outline Grouting and repair works shall be carried out using Speedsure S Grout as manufactured by Parex Ltd. The product must be stored, handled and used strictly in accordance with the manufacturer’s instructions. Quality Assurance Parex Limited has an integrated business management system. This is externally accredited by UK CARES to BS EN ISO 9001:2015, BS EN ISO 14001:2015, BS ISO 45001:2018 and BES 6001.Orders placed before 2pm Monday – Friday (excluding Bank Holidays) will be dispatched the same day if ‘Next Day Delivery’ is displayed on the product listing. Orders placed after this time will be dispatched the following working day.
Orders for non-stock items will be dispatched within 3-5 working days unless contacted by Customer Services.
Saturday and timed deliveries are available on request. Please contact [email protected] or call 01708 855 698 for more information.
Please note postcodes in some areas of the Scottish Highlands and offshore addresses require a delivery surcharge and in some cases can take longer to be delivered. Please contact [email protected] or call 01708 855 698 for a delivery quote.
AB36-38, AB55-56, FK17-21, G83, GY9, HS1-9, IM (ALL), IV (ALL), JE (ALL), KA27, KA28, KW0-14, KW15-17, PA20-78, PH15-18, PH19-29, PH32-33, PH45-48, PH30-31, PH34-44, PH49-99, PO38, ZE (ALL)
It is the customers responsibility to provide an accurate delivery address. If the courier is unable to deliver your order due to issues with access to the delivery address, your goods will be returned to the local delivery depot for delivery on the next working day. Please note a redelivery charge of up to £89 plus VAT per pallet may be applied. If your order is undelivered and returned to us a restocking fee may also be applied.
Please inform us of any delivery restrictions (eg weight restrictions, narrow roads). Failure to do so may incur a redelivery charge if the courier cannot access the delivery address due to undeclared or incorrect delivery restrictions. A redelivery charge of up to £89 plus VAT per pallet may be applied.
If your order is over 150kg it may be delivered on a pallet. The courier will notify you of a two hour delivery window. In the event that no one is available at the address to receive the delivery a charge of up to £89 plus VAT per pallet may be applied for redelivery.
You may also like
Parex Speedsure S Grout FAQs
What is Parex Speedsure S Grout?
Parex Speedsure S Grout is a rapid setting, high strength, non-shrink cementitious grout.
How do I mix Parex Speedsure S Grout?
For each 25 kg bag of Parex Speedsure S Grout, 3 litres to 3.75 litres of water are required. Single bag mixes should be prepared using a high torque slow speed drill with a grout stirrer. Pour the required quantity of clean water into the mixing vessel. Slowly add the Parex Speedsure S Grout to the water whilst continually mixing. Continue mixing for 1 minute until a homogenous mix is achieved. Place grout immediately.
How do I apply Parex Speedsure S Grout?
Parex Speedsure S Grout should be hand poured into place immediately after mixing. Continuous placing is important, pouring from one side of the formwork until the grout appears at the opposite side of the grouting area. Do not disturb once grouting has been completed before the grout has hardened.
Parex Speedsure S Grout may be placed at temperatures between 5°C and 35°C. For temperatures above 20°C care should be taken to avoid premature setting before complete placement has been achieved.






